Campus Design Review Team (CDRT)
Implementing the Campus Master Plan
The UW Bothell and Cascadia College campus master plan establishes a long-term vision of the shared campus and serves to guide the responsible growth and physical development of the Bothell campus. To implement the design principles of the Campus Master Plan, the Campus Design Review Team (CDRT) was formed including representation from both institutions to advise the Chancellor of the University of Washington Bothell and the President of Cascadia College.
The primary purpose of CDRT is to maximize the functionality and desirable experiential qualities of the campus, its facilities, and setting. The CDRT reviews all projects that either individually or cumulatively have temporary or permanent visual and/or functional impacts on the campus setting, including any historic resources. The campus setting is defined for CDRT purposes as the campus landscape, plantings, circulation corridors and gathering places, building exteriors, public spaces and rights of way, signage, and shared building interior public spaces. The CDRT reviews project plans at the earliest possible time in a project so that the project may achieve its goals and those of the University/College within budget and schedule parameters.
Announcements
- 2024 – 2025 CDRT Charge Letter
- 2023 Annual Report
- 2022 Annual Report
- 2021 Annual Report
- 2020 Annual Report
- Proposed Project Form
- CDRT Intake Form
- Template Form with Appendix
- Review Process
- Campus Master Plan
2024 – 2025 Scheduled Meetings
- October 24, 2024, 3:05pm
- December 12, 2024, 1:05pm
- January 23, 2025, 1:05pm
- February 27, 2025, 1:05pm
- April 17, 2025, 1:05pm